BRADAMA successfully delivered a 10km section of the AKK Pipeline through challenging rocky terrain characterized by extensive rock formations requiring continuous drilling and blasting operations.
Despite the demanding geological conditions and reduced excavation productivity, the project was completed safely and efficiently through specialized rock excavation techniques and disciplined execution.
The project further demonstrated BRADAMA’s expertise in handling complex terrain and executing pipeline infrastructure under extreme geological conditions.